Skip to content

Marbella · Costa del Sol

Outdoor · Patios, Paving & Pathways

Patios, paving and pathways in Marbella, laid to stay level.

Patios, paving and pathways laid on a proper base, with the drainage worked out.

Scope
Patios, paving, pathways
Goes with
Drainage, walls, pool surrounds
Area
Marbella to Estepona

In short

Apex Construction lays patios, paving and pathways in Marbella, Puerto Banús, Nueva Andalucía, San Pedro de Alcántara, Benahavís and Estepona. The work includes the groundworks and base beneath the paving and the drainage around it, because that is what decides whether paving stays level.

Paving laid in a diagonal grid with green joints between a pool and a lawn, seen from above

What is included

What the work can cover

Good paving is mostly what you cannot see. This is what a paving job can include.

  • 01

    Patios

    A paved area for sitting and eating, beside the house or out in the garden.

  • 02

    Paving around pools

    Paving around the water, on its own or with decking and tiled terraces.

  • 03

    Pathways

    Paths that link the house, the pool, the gate and the garden.

  • 04

    Groundworks and base

    Excavation and a compacted base, so the paving does not sink or move.

  • 05

    Drainage

    Falls and drainage so water leaves the surface instead of standing on it.

  • 06

    Edges and walls

    Edging, garden walls and steps where the paving meets other levels.

Is it time?

When paving needs relaying

  • Slabs have sunk, lifted or rock underfoot.
  • Puddles form in the same places every time it rains.
  • Old paving has dated the whole garden.
  • There is no proper path, so people walk across the lawn or the planting.

Thinking about paving & patios?

Tell us what you have in mind. A request does not commit you to anything: it simply starts the conversation.

Process

From first contact to finished work

  1. 01

    Tell us what you need

    Use the quote form or call. A few lines and a couple of photos are enough to start.

  2. 02

    We look at the job

    We go through the details with you and see the property, so the quote reflects what is actually there.

  3. 03

    You receive a quote

    A quote for the work discussed, for you to consider in your own time.

  4. 04

    The work is carried out

    One company for the building work, inside and out, through to the finished result.

Cost

What decides the cost of paving

Paving is quoted individually. These factors matter most.

Area
The size of the area sets the amount of material and labour.
The ground beneath
Soft, sloping or previously filled ground needs more preparation.
Material and pattern
The paving chosen and the pattern it is laid in both affect the time involved.
Drainage and walls
Drainage, edging and retaining walls are often part of the same job.

Questions

Paving & patios: common questions

Can new paving be laid on top of the old?

Sometimes, but only if what is there is sound and the levels allow it. In many cases the old paving and part of the base have to come up. We can tell you once we have seen it.

Do you deal with the drainage as well?

Yes. Drainage and groundworks are on our service list and are planned together with the paving.

Do you lay paving around swimming pools?

Yes. Pool terraces and surrounds are one of our main services.

Which areas do you cover for paving?

Marbella, Puerto Banús, Nueva Andalucía, San Pedro de Alcántara, Benahavís, Estepona and the surrounding Costa del Sol.

What do you need from me to prepare a quote?

Where the property is, a short description of what you want done and, if you have them, a few photos. You can send all of that through the quote form in a couple of minutes, or call and talk it through first.

Related work we also carry out

CallWhatsAppRequest a quote